Project Status:  Under Construction
Completion Anticipated:  August 2019
Architect:  Nichols, Melburg & Rossetto
Contractor:  SNL Group, Inc.

Involved in the 2019 Summer Infrastructure project will be many upgrades throughout the main campus. The water loop from teh 6500 building to the 2600 building will be replaced including new hydrants. The sewer lining  from the dorms to the 2600 building, the 500 building to the 2400 building will be replaced. Electrical upgrades will be done from the main switchgear in the 2500 building to the new CTE building.  Gas lines will be upgraded from the 1100 building to the 2600 building.